Aside from the refurbishing of the St. La Salle Hall, the construction of the Henry Sy Hall at the site of the former football field is still ongoing. Let's say this place will be crowded at best in the event of heavy floods, but just bear with the inconvenience caused by these, because it's for the modernization of DLSU's facilities.
Finally, I'm welcoming the upcoming frosh class as well, even if I'll only see them for one term.
As for my thesis screenplay, the draft itself is finished. I'll have the entire term to revise and refine the script. I have four subjects left, and I want to finish them as hard as I could. So good luck to me and my fellow soon-to-be graduates this term.
No comments:
Post a Comment